Uptime calculator: how much downtime does 99.9% allow?

99.9% uptime allows about 43 minutes of downtime in a 30-day month, 10 minutes a week and 8.8 hours a year.

Allowed downtime for 99.9% uptime
PerAllowed downtime
Day1 min 26 s
Week10 min 5 s
Month (30 days)43 min 12 s
Quarter (90 days)2 h 9 min 36 s
Year (365 days)8 h 45 min 36 s

99.9% uptime allows 43 min 12 s of downtime per 30-day month.

Downtime for common uptime targets

Allowed downtime by uptime percentage
UptimeDayWeekMonth (30 days)Quarter (90 days)Year (365 days)
90%one nine2 h 24 min16 h 48 min3 d9 d36 d 12 h
95%1 h 12 min8 h 24 min1 d 12 h4 d 12 h18 d 6 h
99%two nines14 min 24 s1 h 40 min 48 s7 h 12 min21 h 36 min3 d 15 h 36 min
99.5%7 min 12 s50 min 24 s3 h 36 min10 h 48 min1 d 19 h 48 min
99.9%three nines1 min 26 s10 min 5 s43 min 12 s2 h 9 min 36 s8 h 45 min 36 s
99.95%43 s5 min 2 s21 min 36 s1 h 4 min 48 s4 h 22 min 48 s
99.99%four nines9 s1 min4 min 19 s12 min 58 s52 min 34 s
99.999%five nines0.86 s6 s26 s1 min 18 s5 min 15 s

How to use it

  1. Pick Uptime to downtime and type the uptime target from your SLA or SLO, such as 99.9. The table shows the allowed downtime per day, week, 30-day month, 90-day quarter and 365-day year.
  2. Use the quick buttons to compare common targets, from 99% up to 99.999%.
  3. Switch to Downtime to uptime to go the other way. Enter how long your service was down, the unit, and the period you measure over.
  4. Copy the one-line result into your SLA report, status page or incident review.

Questions

How much downtime is 99.9% uptime?
99.9% uptime allows 43 minutes 12 seconds of downtime in a 30-day month, 10 minutes 5 seconds per week, 1 minute 26 seconds per day and 8 hours 45 minutes 36 seconds per 365-day year.
What is the difference between 99.9% and 99.99%?
It is a factor of ten. 99.9% allows about 8.8 hours of downtime a year, 99.99% allows about 53 minutes. Each extra nine usually costs far more in redundancy and on-call effort than the one before it.
Which month length does the calculator use?
A month is 30 days, a quarter 90 days and a year 365 days. Calendar months vary, so a 31-day month allows slightly more downtime and February slightly less.
Does planned maintenance count against uptime?
It depends on your SLA. Many contracts exclude announced maintenance windows, others count every minute the service is unavailable. Check the definition of downtime in your agreement before you plan around the number.
Is uptime the same as availability?
In most SLAs they mean the same thing: the share of the measurement period in which the service worked. Some contracts measure by successful requests instead of minutes, which gives different numbers for partial outages.

More free tools